Use D-Tools SI to Manage Your Projects
D-Tools System Integrator (SI) not only provides a comprehensive library of low-voltage products, proposal solutions, and engineering drawing tools but also offers extensive project management features—including sophisticated change order tracking, streamlined purchasing and receiving processes, labor resource scheduling, real-time field communication, accurate project documentation, and tools to ensure projects are completed on time and within budget.
Most in the industry recognize that D-Tools System Integrator (SI) offers a robust library of low-voltage products, a comprehensive and flexible proposal solution, and an integrated and efficient engineering drawing platform. However, many may not be aware of the broad range of project management features that D-Tools SI has added in recent years.
When it comes to managing projects, there are several keys to success:
- Change orders being accurately tracked and billed
- Equipment/materials being ordered, received, and delivered in time for installation
- Technicians and other labor resources being allocated, scheduled, and tasked
- Field activity and details being communicated back to the project manager/office
- Project documentation remaining up to date and accurate
- Project completion coming in on time and on budget
Let's explore how D-Tools SI addresses each of these critical success factors.
Change Orders
A project can quickly turn from profitable to unprofitable if change orders are not accurately tracked and billed. D-Tools SI incorporates a sophisticated change order module (updated in SI 2018) and, if used properly, prevents design oversights through a series of checks and balances. For example, if you update a drawing, that change is automatically reflected on the bill of materials, and vice versa. That design change, regardless of whether it is positive or negative, and regardless of whether it has resulted from a change to the equipment list or a drawing, appears as a pending change order. A similar check and balance process occurs when issuing purchase orders and work orders.
Purchasing and Receiving
D-Tools SI makes it easy to order, account for, and track products for a project. Because D-Tools SI utilizes manufacturer product specifications as the basis to generate proposals and drawings, that information can be leveraged to generate purchase orders (which can be organized by vendor, project phase, category, etc.). Purchase Orders can contain products from a single project or can be expanded to include products for multiple projects. Purchase orders can be sent directly to vendors via SI’s Outlook integration or sent to the D-Tools Vendor Portal, where vendors can accept, comment, and respond to specific issues or questions. POs can be pushed over to QuickBooks for accounting purposes, and products received can be accepted and tracked within SI. Project items are tracked in the SI project via a date stamp and item status (i.e., Ordered, Received, Installed).
Item Tracking
Project managers need to know the status of items designated for a given project at a glance. When items are ordered, received, and picked (on a pick list) in SI and the installation date is noted using Mobile Install, item status dates populate automatically so project managers are never in the dark when it comes to parts status. Other date fields such as date requested, date shipped, date staged, and date delivered can be added and manually populated for a more comprehensive view.
Scheduling
The D-Tools SI scheduling module allows installation managers to schedule technicians, individually or in teams, on a per-project basis. Installation tasks (Work Orders) and Service Orders can be assigned to resources and organized by project phase, location, or system. These tasks and Service Orders can be assigned via the Mobile Install (MI) web-based app, which enables field technicians to manage these tasks on-site, and can also be assigned via Google or Outlook calendar.
Work Orders
Technicians at companies that routinely use work orders are typically 15-20% more productive than those at companies that have not embraced this discipline. With a detailed list of tasks to perform when arriving on the job (along with all required drawings and documentation), a technician is productive from the start. Without a work order, a technician may spend time determining what needs to be done and where to start, checking for parts, and possibly realizing that required parts are not available. Detailed work orders are critical to field efficiency. D-Tools SI enables a disciplined work plan so technicians remain focused and productive throughout the day.
Field Communication
Getting accurate reporting from the field is a constant challenge for most system integrators. Using the Mobile Install app, technicians are asked to document their every move—mark tasks completed, enter time, add site photos and notes, document serial numbers, IP addresses, and MAC addresses, and even document extra work (such as field change orders), which can be approved on-site by the contractor. All of this information syncs back to the SI project file and is formally stored as a permanent record. Project managers are automatically notified when a task is updated or completed.
In summary, D-Tools offers a comprehensive set of tools that ensure on-time and on-budget delivery of your projects. Importantly, since D-Tools’ data-driven approach is integral to the entire set of project management features, change orders, purchase orders, work orders, etc. are generated quickly and easily, and the data remains linked for future tracking and archival.
Related
D-Tools Showcases Smarter, Scalable Project Management Solutions at InfoComm 2026
At InfoComm 2026, D-Tools unveiled advanced AI-powered project management solutions including enhanced multi-user collaboration, a sophisticated Inventory Asset Management system assigning unique digital identities to physical AV assets, and an improved Mobile Install App across its System Integrator v24 and D-Tools Cloud platforms, all designed to help AV integrators streamline complex projects, improve operational efficiency, and scale their businesses effectively.
Sound Stage Reduces AV Design and Proposal Times for Company and Florida Hospital Project
Sound Stage, Inc., a seasoned AV integration company, significantly reduced project time, streamlined proposals, and improved design efficiency for a complex multi-floor Florida Hospital Executive Tower project by implementing D-Tools System Integrator software, which centralized their product database, enabled easy drag-and-drop proposal creation, allowed quick adjustments to pricing and labor, and helped maintain project profitability throughout the process.
D-Tools System Integrator V23: Revolutionizing Multi-Office Operations for AV Integrators
D-Tools System Integrator v23 revolutionizes AV integrators' multi-office operations by providing enhanced multi-location collaboration tools, improved user experience, and scalable integrations that unify data and workflows across distributed teams, addressing challenges like data silos and communication gaps to boost efficiency and consistency in project management and system design.
Project Management Software for System Integrators
D-Tools Cloud offers system integrators a comprehensive project management software suite that streamlines workflows from contract to installation by enabling change management, task and resource scheduling, field technician oversight via mobile app, and real-time performance and cost tracking to ensure projects are completed on time and within budget.
D-Tools System Integrator v23: Overcoming Common Challenges and Maximizing Efficiency
The article discusses how D-Tools System Integrator v23 software helps overcome common industry challenges by providing practical solutions like real-time Job Cost Reports that enable teams to accurately track and analyze project costs throughout the lifecycle, thereby reducing fear and frustration associated with post-installation financial assessments.
Implementing D-Tools Helped Integrator Nick of Time Increase Revenues by 50 Percent
After implementing D-Tools’ System Integrator platform, Nick of Time, led by president Nicholas Suchyta, increased revenues by 50 percent and reduced project workload by up to 60 percent, enabling faster bidding and approvals through MobileQuote and the Customer Portal, which helped transform a simple coaxial cable job into a comprehensive smart home installation featuring advanced audio/video systems, security cameras, smart lighting, and extensive network coverage in Bay City's most technologically advanced home.